Twitter Interface

Facts

Download Flyer
Primer:
GI 110, GI 115 Drying time 8-12 h at 20°C
Alternative:
GI 118 (rapid primer only suitable under rigid / inflexible coatings, for more information see data sheet) Drying time 4-6 h at 20°C

System description

Whether hospital, car supplier, explosive-prone, computer rooms, electronic production, chip industries etc., Gremmler Bauchemie offers for every area of application the best possible solution with its conductive coating systems.

Standard systems are AS and ESD (system structures see below). System AS satisfi es the demands for conductive coating systems according to DIN EN 61340-4-1 and has a contact resistance of less than 106 Ohm.